Division B
Acceptable Solutions

Part 9 — Housing and Small Buildings

Section 9.27. Cladding

9.27.1. Application

9.27.1.1. General
1) Intent StatementWhere lumber, wood shingles, shakes, fibre-cement shingles, planks and sheets, plywood, OSB, waferboard, hardboard, vinyl, aluminum or steel, including trim and soffits, are installed as cladding on wood-frame walls exposed to precipitation, the cladding assembly shall comply with
b) Part 5.
2) Intent StatementWhere stucco is installed as cladding on wood-frame or masonry walls exposed to precipitation, the cladding assembly shall comply with
b) Part 5.
3) Intent StatementWhere masonry serves as cladding on wood-frame or masonry walls exposed to precipitation, the cladding assembly shall comply with
b) Part 5.
4) Intent StatementWhere asphalt shingles are installed as cladding on wood-frame walls exposed to precipitation, the cladding assembly shall comply with
b) Part 5.
5) Intent StatementWhere cladding materials other than those described in Sentences (1) to (4) are installed, or where the cladding materials described in Sentences (1) to (4) are installed on substrates other than those identified in Sentences (1) to (4), the materials and installation shall comply with Part 5.

9.27.2. Required Protection from Precipitation

(See Appendix A.)
9.27.2.1. Minimizing and Preventing Ingress and Damage
1) Intent StatementExcept where exterior walls are protected from precipitation or where it can be shown that precipitation ingress will not adversely affect occupant health or safety, exterior walls shall be designed and constructed to
a) minimize the ingress of precipitation into the assembly, and
b) prevent the ingress of precipitation into interior space.
(See Appendix A.)
2) Intent StatementExcept where exterior walls are protected from specific mechanisms of deterioration, such as mechanical impact and ultraviolet radiation, exterior walls shall be designed and constructed to minimize the likelihood of their required performance being reduced to an unacceptable level as a result of those mechanisms.
9.27.2.2. Minimum Protection from Precipitation Ingress
(See Appendix A.)
1) Except as provided in Sentence (2), a cladding assembly is deemed to have a capillary break between the cladding and the backing assembly, where
a) there is a drained and vented air space not less than 9.5 mm deep behind the cladding, over the full height and width of the wall (see also Article 9.27.5.3.),
b) an open drainage material, not less than 9.5 mm thick and with a cross-sectional area that is not less than 80% open, is installed between the cladding and the backing, over the full height and width of the wall,
c) the cladding's components are hollow-backed metal or vinyl and are horizontally oriented and loosely fastened to the backing substrate, or
d) the wall is a masonry cavity wall or the cladding is masonry veneer constructed according to Section 9.20.

contentHistory

2) The drained and vented air space, and drainage material described in Sentence (1) may be interrupted by
a) penetrations for windows, doors and services,
b) flashing,
c) change beginnominally vertical furring or strapping, provided the furring or strapping does not make up more than 20% of the drained and vented air space, and
d) insect screen, provided the screen allows for drainage and venting of the airspace.change end

contentHistory

3) Intent StatementWhere a construction projects over the top of the drained and vented air space described in Clause (1)(a) or over the drainage material described in Clause (1)(b), the air space or drainage material shall not be contiguous with concealed spaces in the projecting construction.
4) Intent StatementExterior walls exposed to precipitation shall be protected against precipitation ingress by an exterior cladding assembly consisting of a first plane of protection and a second plane of protection, where such walls enclose spaces of residential occupancy or spaces that directly serve spaces of residential occupancy.
5) Intent StatementExcept as provided in Sentence (6), exterior walls exposed to precipitation shall be protected against precipitation ingress by an exterior cladding assembly consisting of a first plane of protection and a second plane of protection incorporating a capillary break, where
a) the number of degree-days is less than 3400 and the moisture index is greater than 0.90, or
b) the number of degree-days is 3400 or more, and the moisture index is greater than 1.00.
(See Sentence 1.1.3.1.(1) and Appendix C for information on the moisture index.)
6) Intent StatementIn exterior walls described in Sentence (5), the first and second planes of protection need not incorporate a capillary break, where
a) it can be shown that omitting the capillary break will not adversely affect the performance of the building assemblies,
b) the building is an accessory building, or
c) the wall
i) is constructed of non-moisture-sensitive materials, and intersecting or supported floors are also constructed of non-moisture-sensitive materials, or
ii) is constructed as a mass wall of sufficient thickness to minimize the transfer of moisture to the interior.
9.27.2.3. First and Second Planes of Protection
1) Intent StatementWhere walls required to provide protection from precipitation comprise cladding assemblies with first and second planes of protection,
a) the first plane of protection shall
i) consist of cladding with appropriate trim, accessory pieces and fasteners, and
ii) be designed and constructed to minimize the passage of rain and snow into the wall by minimizing holes and managing precipitation ingress caused by the kinetic energy of raindrops, surface tension, capillarity, gravity, and air pressure differences (see Subsection 9.27.4.),
b) the second plane of protection shall be designed and constructed to (see Subsection 9.27.3.)
i) intercept all rain and snow that gets past the first plane of protection, and
ii) effectively dissipate any rain or snow to the exterior, and
c) the protection provided by the first and second planes of protection shall be maintained
i) at wall penetrations created by the installation of components and services such as windows, doors, ventilation ducts, piping, wiring and electrical outlets, and
ii) at the interface with other wall assemblies.
9.27.2.4. Protection of Cladding from Moisture
1) Intent StatementA clearance of not less than 200 mm shall be provided between finished ground and cladding that is adversely affected by moisture, such as untreated wood, plywood, OSB, waferboard and hardboard.
2) Intent StatementA clearance of not less than 50 mm shall be provided between a roof surface and cladding that is adversely affected by moisture, such as untreated wood, plywood, OSB, waferboard and hardboard.

9.27.3. Second Plane of Protection

9.27.3.1. Elements of the Second Plane of Protection
(See Appendix A.)
1) Intent StatementThe second plane of protection shall consist of a drainage plane having an appropriate inner boundary and flashing to dissipate rainwater to the exterior.
2) Intent StatementThe inner boundary of the drainage plane shall comply with Articles 9.27.3.2. to 9.27.3.6.
3) Intent StatementThe protection provided by the second plane of protection shall be maintained
a) at wall penetrations created by the installation of components and services such as windows, doors, ventilation ducts, piping, wiring and electrical outlets, and
b) at the interface with other wall assemblies.
4) Intent StatementFlashing material and its installation shall comply with Articles 9.27.3.7. and 9.27.3.8.
9.27.3.2. Sheathing Membrane Material Standard
1) Intent StatementSheathing membranes shall conform to the performance requirements of CAN/CGSB-51.32-M, “Sheathing, Membrane, Breather Type.”
9.27.3.3. Required Sheathing Membrane and Installation
1) Intent StatementExcept as provided in Articles 9.27.3.4. to 9.27.3.6., at least one layer of sheathing membrane shall be applied beneath cladding.
2) Intent StatementSheathing membrane required in Sentence (1) shall be applied so that joints are lapped not less than 100 mm.
3) Intent StatementWhere sheathing membrane required in Sentence (1) is applied horizontally, the upper sheets shall overlap the lower sheets.
9.27.3.4. Insulating Sheathing in lieu of Sheathing Membrane
1) Intent StatementWhere non-wood-based rigid exterior insulating sheathing, or exterior insulating sheathing with an integral sheathing membrane is installed, a separate sheathing membrane is not required.
2) Intent StatementWhere insulating sheathing is installed as provided in Sentence (1),
a) sheathing panels subject to moisture deterioration shall be sealed at all joints, and
b) the joints of sheathing panels not subject to moisture deterioration shall be
i) sealed at all joints, or
ii) lapped or tongue and groove, and detailed to ensure drainage of water to the exterior.
(See Appendix A.)
9.27.3.5. Sheathing Membranes in lieu of Sheathing
1) Intent StatementExcept as provided in Article 9.27.3.6., where no sheathing is used, at least 2 layers of sheathing membrane shall be applied beneath the cladding. (See Article 9.23.17.1. and Appendix A.)
2) Intent StatementAll joints in the sheathing membrane required in Sentence (1) shall occur over framing, and the membrane shall be fastened to the framing with roofing nails or staples spaced not more than 150 mm along the edges of the outer layer of sheathing membrane.
3) Intent StatementWall sheathing is permitted to be used in lieu of one layer of sheathing membrane required in Sentence (1), and its thickness need not conform to Table 9.23.17.2.A
9.27.3.6. Face Sealed Cladding
(See Appendix A.)
1) Intent StatementSheathing membrane is permitted to be omitted beneath cladding when the joints in the cladding are formed to effectively prevent the passage of wind and rain in conformance with Sentences (2) or (3), as applicable.
2) Intent StatementCladding consisting of sheets of plywood, hardboard, OSB, waferboard or fibre cement is considered to meet the requirements of Sentence (1), provided the cladding is applied so that
a) all edges are directly supported by framing,
b) the vertical joints between adjacent sheets are sealed and
i) covered with battens,
ii) shiplapped, or
iii) otherwise matched to provide weathertight joints, and
c) the horizontal joints between adjacent sheets are sealed and
i) shiplapped, or
ii) otherwise matched to provide weathertight joints.
3) Intent StatementMetal siding consisting of sheets of metal is considered to meet the requirements of Sentence (1) where the joints between sheets are of the locked-seam type.
9.27.3.7. Flashing Materials
1) Intent StatementFlashing shall consist of not less than
a) 1.73 mm thick sheet lead,
b) 0.33 mm thick galvanized steel,
c) 0.46 mm thick copper,
d) 0.46 mm thick zinc,
e) 0.48 mm thick aluminum, or
f) 1.02 mm thick vinyl.
9.27.3.8. Flashing Installation
1) Intent StatementExcept as provided in Sentence (2), flashing shall be installed at
a) every horizontal junction between cladding elements,
b) every horizontal offset in the cladding, and
c) every horizontal line where the cladding substrates change and where
i) the substrates differ sufficiently for stresses to be concentrated along that line, or
ii) the installation of the cladding on the lower substrate may compromise the drainage of moisture from behind the cladding above.
(See Appendix A.)
2) Intent StatementFlashing need not be installed as described in Sentence (1)
a) where the upper cladding elements overlap the lower cladding elements by not less than 25 mm,
b) where
i) the cladding above and below the joint is installed outboard of a drained and vented air space (see Clause 9.27.2.2.(1)(a)), and
ii) the horizontal detail is constructed so as to minimize the ingress of precipitation into the air space, or
c) at horizontal construction joints in stucco, where
i) the joint is finished with an expansion-contraction strip, and
ii) the cladding is installed outboard of a drained and vented air space (see Clause 9.27.2.2.(1)(a)).
3) Intent StatementFlashing shall be installed over exterior wall openings where the vertical distance from the bottom of the eave to the top of the trim is more than one-quarter of the horizontal overhang of the eave. (See Appendix A.)
4) Intent StatementFlashing described in Sentences (1) and (3) shall
a) extend not less than 50 mm upward inboard of the sheathing membrane or sheathing installed in lieu of the sheathing membrane (see Article 9.27.3.4.),
b) have a slope of not less than 6% toward the exterior after the expected shrinkage of the building frame,
c) terminate at each end with an end-dam
i) with a height in millimetres not less than 25 mm or 1/10 the value of the 1-in-5 driving rain wind pressure in Pa, and
ii) at the height defined in Subclause (c)(i), extending to the face of the adjacent cladding,
d) lap not less than 10 mm vertically over the building element below, and
e) terminate in a drip offset not less than 5 mm outward from the outer face of the building element below.
(See Appendix A.)
5) Intent StatementWhere the sills of windows and doors installed in exterior walls are not self-flashing, flashing shall be installed between the underside of the window or door and the wall construction below. (See Appendix A.)

9.27.4. Sealants

9.27.4.1. Required Sealants
1) Intent StatementSealant shall be provided where required to prevent the entry of water into the structure.
2) Intent StatementSealant shall be provided between masonry, siding or stucco and the adjacent door and window frames or trim, including sills, unless such locations are completely protected from the entry of rain.
3) Intent StatementSealant shall be provided at vertical joints between different cladding materials unless the joint is suitably lapped or flashed to prevent the entry of rain. (See Articles 9.7.6.2., 9.20.13.12. and 9.28.1.5.)
9.27.4.2. Materials
1) Intent Statementchange beginSealantschange end shall be
a) a non-hardening type suitable for exterior use,
b) selected for their ability to resist the effects of weathering, and
c) compatible with and adhere to the substrate to which they are applied.
change begin(See Appendix A.)change end
2) Intent Statementchange beginSealantschange end shall conform to
a) change beginASTM C 834, “Latex Sealants,”change end
b) change beginASTM C 920, “Elastomeric Joint Sealants,”change end
d) change beginASTM C 1311, “Solvent Release Sealants.”change end
3) Intent Statementchange beginBacker rod shall conform to ASTM C 1330, “Cylindrical Sealant Backing for Use with Cold Liquid Applied Sealants.” (See A-9.27.4.2.(1) in Appendix A.)change end

9.27.5. Attachment of Cladding

9.27.5.1. Attachment
1) Intent StatementExcept as permitted by Sentences (2) to (6), cladding shall be fastened to the framing members or furring members, or to blocking between the framing members.
2) Intent StatementVertical lumber and stucco lath or reinforcing are permitted to be attached to sheathing only where the sheathing consists of not less than
a) 14.3 mm lumber,
b) 12.5 mm plywood, or
c) 12.5 mm OSB or waferboard.
3) Intent StatementVertically applied metal siding and wood shingles and shakes are permitted to be attached to the sheathing only where the sheathing consists of not less than
a) 14.3 mm lumber,
b) 7.5 mm plywood, or
c) 7.5 mm OSB or waferboard.
4) Intent StatementWhere wood shingles or shakes are applied to sheathing which is not suitable for attaching the shingles or shakes, the shingles or shakes are permitted to be attached to a wood lath not less than 38 mm by 9.5 mm thick securely nailed to the framing and applied as described in Article 9.27.7.5.
5) Where fibre-cement shingles are applied to sheathing that is not suitable for attaching the shingles, the shingles are permitted to be fastened to a wood lath not less than 89 mm by 9.5 mm thick securely nailed to the framing.

contentHistory

6) Intent StatementLath referred to in Sentence (5) shall be applied so that it overlaps the preceding shingle course by not less than 20 mm.
9.27.5.2. Blocking
1) Intent StatementBlocking for the attachment of cladding shall be not less than 38 mm by 38 mm lumber securely nailed to the framing and spaced not more than 600 mm o.c.
9.27.5.3. Furring
1) Intent StatementExcept as permitted in Sentences 9.27.5.1.(4) and (5), furring for the attachment of cladding shall be not less than 19 mm by 38 mm lumber when applied over sheathing.
2) Intent StatementWhen applied without sheathing, furring referred to in Sentence (1) shall be not less than
a) 19 mm by 64 mm lumber on supports spaced not more than 400 mm o.c., or
b) 19 mm by 89 mm lumber on supports spaced not more than 600 mm o.c.
3) Intent StatementFurring referred to in Sentence (1) shall be
a) securely fastened to the framing, and
b) spaced not more than 600 mm o.c.
9.27.5.4. Size and Spacing of Fasteners
1) Intent StatementNail or staple size and spacing for the attachment of cladding and trim shall conform to Table 9.27.5.4.
Table 9.27.5.4.
Attachment of Cladding
Forming part of Sentence 9.27.5.4.(1)
Type of Cladding

Minimum Nail or Staple Length, mm (in.)

Minimum Number of Nails or Staples

Maximum Nail or Staple Spacing, mm (in.) (o.c.)

Wood trim

51 (2)

600 (24)

Lumber siding or horizontal siding made from sheet material

51 (2)

600 (24)

Metal cladding

38 (1½)

600 (24) (nailed to framing)

     

400 (16) (nailed to sheathing only)

Wood shakes

     
up to 200 mm (8 in.) in width

51 (2)

2
over 200 mm (8 in.) in width

51 (2)

3

Wood shingles

     
200 mm (8 in.) in width

32 (1¼)

2
over 200 mm (8 in.) in width

32 (1¼)

3
Panel or sheet type cladding      
up to 7 mm (¼ in.) thick

38 (1½)

150 (6) (along edges)

more than 7 mm (¼ in.) thick

51 (2)

300 (12) (along intermediate supports)

9.27.5.5. Fastener Materials
1) Intent StatementNails or staples for the attachment of cladding and wood trim shall be corrosion-resistant and shall be compatible with the cladding material.
9.27.5.6. Expansion and Contraction
1) Intent StatementFasteners for metal or vinyl cladding shall be positioned to permit expansion and contraction of the cladding.
9.27.5.7. Penetration of Fasteners
1) Intent StatementFasteners for shakes and shingles shall penetrate through the nail-holding base or not less than 19 mm into the framing.
2) Intent StatementFasteners for cladding other than that described in Sentence (1) shall penetrate through the nail-holding base or not less than 25 mm into the framing.

9.27.6. Lumber Siding

9.27.6.1. Materials
1) Intent StatementLumber siding shall be sound, free of knot holes, loose knots, through checks or splits.
9.27.6.2. Thickness and Width
1) Intent StatementDrop, rustic, novelty, lapped board and vertical wood siding shall be not less than 14.3 mm thick and not more than 286 mm wide.
2) Intent StatementBevel siding shall be
a) not less than 5 mm thick at the top, and
b) not less than
i) 12 mm thick at the butt for siding 184 mm or less in width, and
ii) 14.3 mm thick at the butt for siding wider than 184 mm.
3) Intent StatementBevel siding shall be not more than 286 mm wide.
9.27.6.3. Joints
1) Intent StatementLumber siding shall prevent water from entering at the joints by the use of lapped or matched joints or by vertical wood battens.
2) Intent StatementSiding shall overlap not less than 1 mm per 16 mm width of lumber, but not less than
a) 9.5 mm for matched siding,
b) 25 mm for lapped bevel siding, or
c) 12 mm for vertical battens.

9.27.7. Wood Shingles and Shakes

9.27.7.1. Materials
1) Intent StatementShingles and shakes shall conform to
2) Intent StatementWestern cedar shakes shall be not less than No. 1 or Handsplit grade, and western cedar shingles not less than No. 2 grade, except that No. 3 grade may be used for undercoursing.
3) Intent StatementEastern white cedar shingles shall be at least B (clear) grade, except that C grade may be used for the lower course of double course applications.
9.27.7.2. Width
1) Intent StatementShingles and shakes shall be not less than 65 mm or more than 350 mm wide.
9.27.7.3. Fasteners
1) Intent StatementShingles or shakes shall be fastened with nails or staples located approximately 20 mm from each edge and not less than 25 mm above the exposure line for single-course applications, or approximately 50 mm above the butt for double-course applications.
9.27.7.4. Offsetting of Joints
1) Intent StatementIn single-course application, joints in succeeding courses shall be offset not less than 40 mm so that joints in any 2 of 3 consecutive courses are staggered.
2) Intent StatementIn double-course application, joints in the outer course shall be offset from joints in the under-course by not less than 40 mm, and joints in succeeding courses shall be offset not less than 40 mm.
9.27.7.5. Fastening to Lath
1) Intent StatementWhen lath is used with double-course application [see Sentence 9.27.5.1.(4)], it shall be spaced according to the exposure and securely fastened to the framing.
2) Intent StatementThe butts of the under-course of the application referred to in Sentence (1) shall rest on the top edge of the lath.
3) Intent StatementThe outer course of the application referred to in Sentence (1) shall be fastened to the lath with nails of sufficient length to penetrate through the lath.
4) Intent StatementThe butts of the shingles or shakes shall be so located that they project not less than 12 mm below the bottom edge of the lath referred to in Sentence (1).
5) Intent StatementIf wood lath is not used, the butts of the under-course shingles or shakes of the application referred to in Sentence (1) shall be located 12 mm above the butts of the outer course.
9.27.7.6. Exposure and Thickness
1) Intent StatementThe exposure and butt thickness of shingles and shakes shall conform to Table 9.27.7.6.
Table 9.27.7.6.
Exposure and Thickness of Wood Shingles and Shakes
Forming part of Sentence 9.27.7.6.(1)

Shake or Shingle Length, mm (in.)

Maximum Exposure, mm (in.)

Minimum Butt Thickness, mm (in.)

Single Coursing Double Coursing

400 (16)

190 (7 ½)

305 (12)

10 (⅜)

450 (17 ¾)

216 (8 ½)

356 (14)

11 (7/16)

600 (24)

292 (11 ½)

406 (16)

13 (½)

9.27.8. Plywood

9.27.8.1. Material Standards
1) Intent StatementPlywood cladding shall be exterior type conforming to
d) CSA O153-M, “Poplar Plywood.”
9.27.8.2. Thickness
1) Intent StatementPlywood cladding shall be not less than 6 mm thick when applied directly to sheathing.
2) Intent StatementWhen applied directly to framing or over furring strips, plywood cladding thickness shall conform to Table 9.27.8.2.
Table 9.27.8.2.
Minimum Plywood Cladding Thickness
Forming part of Sentence 9.27.8.2.(2)

Spacing of Supports, mm (in.)

Minimum Thickness, mm (in.)

Face Grain Parallel to Supports Face Grain Right Angles to Supports

400 (16)

8 (5/16)

6 (¼)

600 (24)

11 (7/16)

8 (5/16)

3) Intent StatementThe thickness of grooved or textured plywood cladding shall be measured at the point of least thickness.
9.27.8.3. Edge Treatment
1) Intent StatementThe edges of plywood cladding shall be treated with a suitable paint or sealer.
9.27.8.4. Panel Cladding
1) Intent StatementPlywood applied in panels shall have all edges supported.
2) Intent StatementNot less than a 2 mm gap shall be provided between panels referred to in Sentence (1).
3) Intent StatementVertical joints in cladding referred to in Sentence (1) shall be protected with batten strips or sealant when the plywood joints are not matched.
4) Intent StatementHorizontal joints in cladding referred to in Sentence (1) shall be lapped not less than 25 mm or shall be suitably flashed.
9.27.8.5. Lapped Strip Siding
1) Intent StatementPlywood applied in horizontal lapped strips shall have not less than a 2 mm gap provided at the butted ends, which shall be caulked.
2) Intent StatementThe horizontal joints of siding described in Sentence (1) shall be lapped not less than 25 mm.
3) Intent StatementWedges shall be inserted under all vertical butt joints and at all corners when horizontal lapped plywood is applied without sheathing.

9.27.9. Hardboard

9.27.9.1. Material Standards
1) Intent StatementFactory-finished hardboard cladding shall conform to CAN/CGSB-11.5-M, “Hardboard, Precoated, Factory Finished, for Exterior Cladding.”
2) Intent StatementHardboard cladding that is not factory finished shall conform to Types 1, 2 or 5 in CAN/CGSB-11.3-M, “Hardboard.”
9.27.9.2. Thickness
1) Intent StatementType 1 or 2 hardboard cladding shall be not less than
a) 6 mm thick when applied over sheathing that provides continuous support, and
b) 7.5 mm thick when applied over furring or framing members not more than 400 mm o.c.
2) Intent StatementType 5 hardboard cladding shall be not less than 9 mm thick when applied over sheathing that provides continuous support or over furring or framing members spaced not more than 400 mm o.c.
3) Intent StatementWhere hardboard cladding is grooved, the grooves shall not extend more than 1.5 mm into the minimum required thickness. (See Appendix A.)
9.27.9.3. Panel Cladding
1) Intent StatementHardboard cladding applied in panels shall have all edges supported with not less than a 5 mm gap provided between sheets.
2) Intent StatementVertical joints in cladding described in Sentence (1) shall be protected with batten strips or sealant when the joints are not matched.
3) Intent StatementHorizontal joints in cladding described in Sentence (1) shall be lapped not less than 25 mm or shall be suitably flashed.
9.27.9.4. Lapped Strip Siding
1) Intent StatementHardboard applied in horizontal lapped strips shall have not less than a 5 mm gap provided at the butted ends, which shall be sealed or otherwise protected with suitable mouldings.
2) Intent StatementThe horizontal joints of siding described in Sentence (1) shall overlap not less than 1 mm per 16 mm width of siding board but not less than 9.5 mm for matched joint siding or 25 mm for lapped siding.
9.27.9.5. Clearance
1) Intent StatementNot less than 3 mm clearance shall be provided between hardboard cladding and door or window frames.

9.27.10. OSB and Waferboard

9.27.10.1. Material Standard
1) Intent StatementOSB and waferboard cladding shall conform to CSA O437.0, “OSB and Waferboard.”
9.27.10.2. Thickness
1) Intent StatementOSB conforming to O-2 grade shall be not less than 6.0 mm thick where applied directly to sheathing.
2) Intent StatementOSB conforming to O-2 grade applied directly to framing or over furring strips shall conform to the thickness shown for plywood in Table 9.27.8.2. (See Appendix A.)
3) Intent StatementOSB conforming to O-1 grade and waferboard conforming to R-1 grade shall be not less than 7.9 mm thick where applied directly to sheathing.
4) Intent StatementWhere applied directly to framing or over furring strips, OSB conforming to O-1 grade and waferboard conforming to R-1 grade shall be not less than
a) 9.5 mm thick on supports spaced not more than 400 mm o.c., and
b) 12.7 mm thick on supports spaced not more than 600 mm o.c.
9.27.10.3. Panel Cladding
1) Intent StatementOSB and waferboard applied in panels shall have all edges supported and treated with a primer or sealer.
2) Intent StatementNot less than a 3 mm gap shall be provided between sheets in cladding described in Sentence (1).
3) Intent StatementVertical joints in cladding described in Sentence (1) shall be protected with batten strips or sealant when the OSB and waferboard joints are not matched.
4) Intent StatementHorizontal joints in cladding described in Sentence (1) shall be lapped not less than 25 mm or shall be suitably flashed.
9.27.10.4. Clearance
1) Intent StatementNot less than a 3 mm clearance shall be provided between OSB and waferboard cladding and door or window frames.

9.27.11. Metal

9.27.11.1. Material Standards
1) Intent StatementHorizontal and vertical strip steel siding, including flashing and trim accessories, shall conform to CAN/CGSB-93.4, “Galvanized Steel and Aluminum-Zinc Alloy Coated Steel Siding, Soffits and Fascia, Prefinished, Residential.”
2) Intent StatementSteel sheet cladding shall have a minimum thickness of 0.3 mm and conform to CAN/CGSB-93.3-M, “Prefinished Galvanized and Aluminum-Zinc Alloy Steel Sheet for Residential Use.”
3) Intent StatementHorizontal and vertical strip aluminum siding, including flashing and trim accessories, shall conform to CAN/CGSB-93.2-M, “Prefinished Aluminum Siding, Soffits, and Fascia, for Residential Use.” (See Appendix A.)
4) Intent StatementAluminum sheet cladding shall conform to CAN/CGSB-93.1-M, “Sheet, Aluminum Alloy, Prefinished, Residential,” and shall have a thickness of not less than 0.58 mm, except that siding supported by backing or sheathing shall have a thickness of not less than 0.46 mm. (See Appendix A.)

9.27.12. Vinyl Siding

9.27.12.1. Material Standard
1) Intent StatementVinyl siding, including flashing and trim accessories, shall conform to CAN/CGSB-41.24, “Rigid Vinyl Siding, Soffits and Fascia.”
9.27.12.2. Attachment
1) Intent StatementThe attachment of vinyl siding shall conform to the requirements in Subsection 9.27.5. for metal siding.